Q reviews your RAMS.
Every RAMS that arrives gets a structured first review from Q — checked against the task, site, contractor, hazards, controls and related records before a human reviewer opens page one.

The bottleneck that holds up every start date
The problem
A subcontractor’s RAMS lands late. The work starts soon. Under pressure, reviews become skims and generic documents slip through.
The Q turn
Q reviews every document on arrival. It checks whether controls are specific, adequate and aligned to the actual work. Your competent person still decides — but starts from a marked-up review, not a blank read.
Four steps, none of them yours
Document arrives
A subcontractor uploads RAMS through the controlled workflow.
Q reviews against scope
Q checks the method against the task, site, contractor and hazards.
Q flags the gaps
Missing rescue plans, wrong substances, generic controls, contradictions and missing evidence.
Your expert decides
The reviewer approves, rejects or requests changes with Q’s findings attached.
Watch Q work
Method statements, marked in minutes.
4 min typical first-pass review
Q reads these modules
The records this superpower works from — every one on the same operating record.
What your team gets back.
Days become minutes
First-pass review no longer blocks the start date.
Every page, every time
Q does not skim page 37.
A consistent bar
Generic RAMS get caught consistently.
4min
typical first-pass review
100%
pages actually read
0
rescue plans missed
See Q review your RAMS on a real document.
Bring a real RAMS to the demo. No slideware — Q will mark it live.
Live in 1–4 weeks. Cyber Essentials certified · ISO 27001-aligned. Humans in charge.












